![]() |
- 500 h of training in state of the art techniques, for its
engineers and technicians,
- and 1200 h of development work done by engineers in the design office. |
![]() |
![]() |
![]() |
Neu Systèmes Ferroviaires provides a global service by
integrating its manufacturing and
assembly line close to the Marcq-en-Baroeul
investigation and test center. Due to its structure, Neu
Systèmes Ferroviaires réalise une prestation globale.
Par sa structure, NEU Systèmes Ferroviaires is capable of managing
orders for 5 to 700 air treatment units with the same technical and economic
relevance, and has everything it needs to seize opportunities coming up in
the third millennium.
All these efforts have been rewarded by the development of major innovations : |
||
| overpressure damper | |||
| the double flow, hot and cold fan | |||
| progress in acoustics | |||
| diffusion profiles | |||
| hardware and software maintenance assistance tools | |||
| equipment control tools (power modulation, regulation) |
|
|
||
|
|
|
|
70, rue du Collège 59700 Marcq-en-Baroeul (France) |
(33) 03 20 45 65 46 |
(33) 03 20 45 64 85 |